Update about the waterfront lot of Tlaga Gaw Tlaas.
1. Septic pipe being installed behind Ocean House to service the next lot (November 2022)
2. Temporary cloth wall [covering] over the bank to protect Ocean House (Winter 2022)
3. Installation of a [septic] lift station to service multiple lots: into the grounds surface
(Spring 2023)
If you would like to speak with someone about any questions or concerns about the site you can
contact: Tarah Samuels at: 604-763-1539.
0 Comments